Occupancy Certificate in GHMC: Apply Online, Fees and Status

Occupancy Certificate in GHMC: Apply Online, Fees and Status

An occupancy certificate (OC) in the Greater Hyderabad Municipal Corporation (GHMC) confirms that a completed building has undergone the required verification against its sanctioned building plan and applicable building regulations. 

FAQs
Videos

You may have a pre-approved offer

Enter required loan against property amount

Please enter amount between ₹3 lakh and ₹15.50 crore

What is an Occupancy Certificate GHMC (Hyderabad)
 

What is an Occupancy Certificate GHMC (Hyderabad)

In summary

An occupancy certificate in GHMC confirms that a building has received the relevant occupancy approval. The municipal authority provides an online application facility through TG-bPASS for eligible buildings, subject to the applicable building category and approval process.

  • The application can be submitted through the online TG-bPASS portal.
  • It requires a building completion notice, sanctioned plan, construction drawings and photographs.
  • The authority will inspect the completed building and identify deviations from the sanctioned plan.
  • GHMC's published Citizen's Charter lists no fee at the time of filing an OC application.
  • GHMC's Citizen's Charter separately specifies a 15-day service timeline.
  • You can track the application and retrieve the issued certificate through the relevant online facility.
  • An occupancy certificate does not independently establish legal ownership of the property.

Before occupying, purchasing or financing a property, check that the occupancy certificate covers the correct building and completed portions. Compare it with the sanctioned building plan, completion documents and relevant ownership records. Resolve any construction discrepancies or pending approvals before making a financial commitment.

Show More
Show Less

What is an occupancy certificate in GHMC?

An occupancy certificate in GHMC is an official document issued by the competent authority after examining whether a completed building complies with its sanctioned building plan and applicable building regulations.


The occupancy certificate process in Telangana is governed by the applicable municipal and building regulations, including the Telangana State Building Permission Approval and Self-Certification System (TS-bPASS) framework. GHMC's published application procedure provides for submission of completion documents, technical scrutiny and site inspection before the certificate is issued.


After completing construction, the applicant must submit the prescribed online occupancy certificate application along with the required documents. The technical officer examines the submitted drawings and prepares a site inspection report. 


For example, if you construct a residential building in Kukatpally, you must submit the prescribed completion notice, drawings and photographs through the applicable online service. The authority examines the completed construction against the sanctioned plan before issuing the occupancy certificate, where required.


An occupancy certificate is different from a building permission. A building permission authorises construction, whereas an occupancy certificate is issued after the completion stage to confirm the relevant compliance and occupancy approval.


If you are considering a property for financing, remember that an occupancy certificate is only one part of the verification process. You should also review the ownership documents and existing mortgage records. These checks are relevant when applying for a Bajaj Finance Loan Against Property, which is subject to legal and property verification.


Need funds against an eligible property? Check eligibility for a loan against property to explore your borrowing options.


Source: Telangana Building Permission Approval and Self-Certification System – Occupancy Certificate Procedure

Show More
Show Less

Why is an occupancy certificate important in GHMC?

An occupancy certificate helps establish that a completed building has undergone the relevant compliance verification by the local authority. It is important when you plan to occupy, purchase, sell or use a property as security for a loan.


The purpose depends on your property-related requirement.

Your situationHow an occupancy certificate helps
Moving into a newly constructed house in MiyapurHelps confirm that the completed building has received the relevant occupancy approval.
Buying a flat in GachibowliHelps you verify whether the building has received the required occupancy approval.
Selling a property in KukatpallySupports the documentation required during property verification.
Purchasing a commercial property in AmeerpetHelps you examine whether the building has received the relevant completion and occupancy approval.
Applying for property-backed financeSupports the lender's legal and technical assessment of the property.

Last reviewed: 30th October, 2026


An occupancy certificate should be checked against the sanctioned building plan and completion records. A certificate for a building does not automatically establish that every subsequent alteration or extension has received approval.


For example, if you purchase an apartment in Kondapur, check whether the certificate relates to the relevant building, block and completed floors. Also compare the approved plan with the actual construction before completing the transaction.


Source: GHMC – Citizen's Charter

How can you apply for an occupancy certificate online in GHMC?

You can apply for an occupancy certificate online through the relevant TG-bPASS service. The application route depends on the building category and the system under which the original building permission was obtained.


Follow these steps:

  1. Open the official TG-bPASS portal.
  2. Select the occupancy certificate application service.
  3. Choose the applicable application type, such as TG-bPASS, DPMS or Others, as requested by the portal.
  4. Enter the applicant's name, contact details and other required information.
  5. Provide the building permission number and property details.
  6. Enter the site and building information, including the survey number, plot area and building details.
  7. Upload the building completion notice certified by the architect or licensed technical professional.
  8. Upload the PDF drawing showing the completed construction.
  9. Attach the prescribed declaration-cum-undertaking and photographs of the completed building.
  10. Review the application and supporting documents.
  11. Submit the application and retain the acknowledgement or reference number.
  12. Track the application and respond to any clarification or inspection request from the authority.
  13. Retrieve the occupancy certificate once it is issued.


The technical officer scrutinises the submitted drawings and prepares a site inspection report to identify any deviations from the sanctioned plan. If deviations are observed, the authority examines whether they are eligible for compounding under the applicable rules.


The TG-bPASS procedure refers to compounding of deviations up to 10% of the sanctioned plan. This is not a blanket permission for unauthorised construction. The competent authority must determine whether the identified deviations are eligible under the applicable regulations.


After scrutiny, the application is forwarded through the prescribed approval process for final approval. The occupancy certificate is issued after the competent authority approves the application.


Last reviewed: 30th October, 2026


Source: TG-bPASS – Occupancy Certificate Application Procedure

Show More
Show Less

What details are required for an occupancy certificate application in GHMC?

The application requires information that helps the authority identify the building, verify the approved construction and examine the completion documents.


The official procedure requests the following details.

Details or documentsPurpose
Applicant's name and contact detailsIdentifies the person submitting the application.
Building permission numberLinks the completion application with the original building approval.
Property addressIdentifies the building's location.
Survey number and plot detailsHelps establish the land parcel on which the building is constructed.
Building completion noticeConfirms that construction has been completed and is submitted for occupancy approval.
Sanctioned building planHelps the authority compare the completed construction with the approved plan.
PDF drawing as per constructionShows the completed building for technical scrutiny.
Declaration-cum-undertakingRecords the prescribed declarations by the owner, builder, architect and structural engineer.
Building photographsProvide visual evidence of the completed building and its surroundings.
Water connection detailsSupports verification of the building's water connection requirements, as listed in GHMC's application checklist.
Electricity billIncluded in GHMC's published application enclosure list.

Last reviewed: 30th October, 2026


The TG-bPASS occupancy certificate procedure specifies a declaration-cum-undertaking on Rs. 100 non-judicial stamp paper, signed by the owner, builder, architect and structural engineer. It also requires a PDF drawing as per the completed construction and photographs covering all sides of the building. Check the latest application checklist before submission, as the requirements may vary depending on the building category and application route.


Sources:

  • GHMC – Application for Occupancy Certificate
  • TG-bPASS – Occupancy Certificate Procedure

Who can apply for an occupancy certificate in GHMC?

The owner or authorised applicant responsible for the completed building can submit an occupancy certificate application, subject to the applicable procedure.


The following applicants may be involved in the process:

  • Building owners: Owners can submit the prescribed completion documents after completing construction in accordance with the sanctioned building plan.
  • Joint owners: Where a property has multiple owners, the application must follow the applicable ownership and authorisation requirements.
  • Authorised representatives: A person authorised by the owner may assist with the application, subject to the portal and local authority requirements.
  • Registered professionals: Architects and structural engineers may certify the completion documents and sign the prescribed undertaking.
  • Developers or builders: They may submit the completion documentation for buildings they have developed, subject to the relevant ownership and authorisation requirements.

The applicant must ensure that the building has been completed in accordance with the sanctioned plan and that the required documents are submitted.


Source: TG-bPASS – Occupancy Certificate Procedure

Show More
Show Less

How can you download an occupancy certificate in GHMC?

Once the competent authority issues the occupancy certificate, you can access the available certificate services through the relevant online platform.


Follow these steps:

  1. Open the official TG-bPASS portal.
  2. Navigate to the relevant occupancy certificate or application service.
  3. Log in or enter the application reference details requested by the portal.
  4. Select the application or certificate retrieval option, if available.
  5. Enter the application number or other requested property details.
  6. Submit the information to retrieve the application or issued certificate.
  7. Download the certificate if the portal provides the facility.
  8. Check the building details, building permission reference and certificate information.


A digitally issued certificate should be checked through the relevant government system. If the certificate details do not match the sanctioned plan or property documents, contact the concerned GHMC office or issuing authority for clarification.


Source: TG-bPASS – Official Portal

Show More
Show Less

What if your occupancy certificate is delayed in GHMC?

GHMC's published Citizen's Charter specifies a service timeline of 15 days for an occupancy certificate. The charter also identifies the officers responsible for rendering the service and those to be contacted in case of delay or default.


The TG-bPASS portal separately publishes category-based processing timelines. It specifies instant processing for certain residential buildings and a 21-day timeline for specified larger residential and non-residential buildings.


If your certificate is not issued within the applicable period, check the application status and confirm whether the authority has raised any objections or requested additional documents.


You can take the following steps:

Possible reasonWhat you should check
Incomplete applicationVerify whether all prescribed fields and documents have been submitted.
Missing completion drawingSubmit the required PDF drawing showing the completed construction.
Differences from the sanctioned planCompare the completed building with the approved building plan.
Pending inspectionContact the concerned authority to understand the inspection status.
Missing declaration or undertakingCheck whether the prescribed declaration has been uploaded and signed.
Pending compounding assessmentCheck whether the authority has identified deviations requiring further scrutiny.
Application not updatedUse the acknowledgement number to raise a status query with the concerned office.

Last reviewed: 30th October, 2026


For example, Karthik, aged 40, has completed a residential building in Manikonda and submitted an occupancy certificate application. The application remains under scrutiny because the completed floor layout differs from the drawing submitted with the application.


Karthik should compare the submitted drawing with the sanctioned plan, consult the registered architect and respond to the authority's clarification. If the deviation is not eligible for compounding, he may need to take corrective action before the application can proceed.


GHMC's Citizen's Charter identifies the Deputy Commissioner, Zonal Commissioner and Assistant Commissioner (Planning) as officers to be contacted for delays or defaults in the occupancy certificate service. You can refer to the charter and contact the relevant officer for your application.


Sources:

  • GHMC – Citizen's Charter
  • TG-bPASS – Published Service Timelines

How can you read an occupancy certificate?

An occupancy certificate contains details that help you identify the approved building and understand the scope of the occupancy approval.


Review the following information:

  • Certificate number: The unique reference assigned to the issued certificate.
  • Owner's details: The name of the applicant or recorded building owner.
  • Property details: The location and identification details of the building.
  • Building permission reference: The original permission against which the completion documents were submitted.
  • Building classification: The category or use of the building, such as residential or commercial.
  • Occupancy details: The approved use and relevant building portions.
  • Floor details: The floors or portions covered by the occupancy approval.
  • Issue date: The date on which the certificate was issued.
  • Conditions: Any limitations or requirements specified by the competent authority.


Consider Sravani, aged 37, who plans to purchase a flat in Kondapur. The seller provides an occupancy certificate for the apartment complex. Before completing the purchase, Sravani checks the certificate number, property address, building permission reference and approved use. She also compares the completed building with the sanctioned plan to identify any differences that may need clarification.


The certificate should be read along with the approved building plan and other property documents. It should not be treated as a replacement for the registered title deed or other ownership records.

Show More
Show Less

What if your occupancy certificate is delayed in GHMC?

GHMC's published Citizen's Charter specifies a service timeline of 15 days for an occupancy certificate. The charter also identifies the officers responsible for rendering the service and those to be contacted in case of delay or default.


The TG-bPASS portal separately publishes category-based processing timelines. It specifies instant processing for certain residential buildings and a 21-day timeline for specified larger residential and non-residential buildings.


If your certificate is not issued within the applicable period, check the application status and confirm whether the authority has raised any objections or requested additional documents.


You can take the following steps:

Possible reasonWhat you should check
Incomplete applicationVerify whether all prescribed fields and documents have been submitted.
Missing completion drawingSubmit the required PDF drawing showing the completed construction.
Differences from the sanctioned planCompare the completed building with the approved building plan.
Pending inspectionContact the concerned authority to understand the inspection status.
Missing declaration or undertakingCheck whether the prescribed declaration has been uploaded and signed.
Pending compounding assessmentCheck whether the authority has identified deviations requiring further scrutiny.
Application not updatedUse the acknowledgement number to raise a status query with the concerned office.

Last reviewed: 30th October, 2026


For example, Karthik, aged 40, has completed a residential building in Manikonda and submitted an occupancy certificate application. The application remains under scrutiny because the completed floor layout differs from the drawing submitted with the application.


Karthik should compare the submitted drawing with the sanctioned plan, consult the registered architect and respond to the authority's clarification. If the deviation is not eligible for compounding, he may need to take corrective action before the application can proceed.


GHMC's Citizen's Charter identifies the Deputy Commissioner, Zonal Commissioner and Assistant Commissioner (Planning) as officers to be contacted for delays or defaults in the occupancy certificate service. You can refer to the charter and contact the relevant officer for your application.


Sources:

  • GHMC – Citizen's Charter
  • TG-bPASS – Published Service Timelines

Does an occupancy certificate prove ownership?

An occupancy certificate does not independently establish legal ownership of a property. It confirms that the building has undergone the relevant completion and occupancy approval process under the applicable building regulations.


The main documents serve different purposes.

DocumentWhat it helps establish
Occupancy certificateCompliance with applicable building requirements and approval for occupation, where required.
Building permitAuthorisation to carry out the approved construction.
Completion reportCertification that the construction has been completed.
Registered sale deedDetails of a registered property transfer.
Property tax recordsAssessment and payment information maintained by the local authority.
Land or revenue recordsDetails of the land and recorded landholding.
Encumbrance certificateRelevant registered transactions identified during the specified search period.
Legal title reviewAssessment of ownership history and potential claims.

Last reviewed: 30th October, 2026


An occupancy certificate does not automatically establish that the person applying for it has undisputed legal title to the land. Similarly, a registered sale deed does not by itself confirm that the building complies with all applicable construction requirements.


If you are purchasing a property in Hyderabad, compare the occupancy certificate with the registered sale deed, building permit, sanctioned plan and relevant land records. Resolve any discrepancies before completing the transaction.


Source: GHMC – Citizen's Charter

What if your occupancy certificate contains errors?

Errors in an occupancy certificate can create difficulties during property transactions, utility applications or loan assessments.

Type of errorWhat you should check
Incorrect owner's nameCompare the certificate with the ownership and application documents.
Wrong property addressVerify the building address and local authority records.
Incorrect building permission numberCheck the original building permission and application acknowledgement.
Difference in building areaCompare the certificate with the sanctioned and completion plans.
Incorrect floor detailsReview the approved building plan and the completion drawings.
Incorrect occupancy categoryCheck the approved building use and completion records.
Missing certificate detailsCheck the application status and issued certificate record.

Last reviewed: 30th October, 2026


For example, an occupancy certificate may show a building area that differs from the approved completion plan. In such a situation, you should submit the relevant building permission, completion notice and drawings to the concerned authority and request verification.

How does an occupancy certificate matter for a loan against property?

An occupancy certificate may form part of the property documents reviewed by a lender when you apply for a loan against property. It helps the lender assess whether the building has received the relevant completion and occupancy approval.


Consider Raghav, aged 44, who owns a commercial property in Banjara Hills and wants funds to expand his business. During the loan against property application process, he submits the occupancy certificate, registered sale deed, building permit and other property documents requested by the lender.


The lender reviews the property's documentation as part of its legal and technical assessment. If the occupancy certificate shows a building area or usage category that differs from the actual property, Raghav may need to obtain clarification from the concerned authority before proceeding.


Bajaj Finance Loan Against Property assesses eligible properties through legal, technical and valuation checks. The applicant's income, credit profile and repayment capacity are also reviewed. Bajaj Finance offers loan amounts of up to ₹15.50 crore, with repayment tenures of up to 15 years, subject to eligibility and property assessment. Before deciding how much to borrow, compare loan against property interest rates and use the loan against property EMI calculator to estimate your repayment commitment. Once you have reviewed your EC, ownership documents and existing mortgage records, you can check your loan against property eligibility with Bajaj Finance to explore your borrowing options.

Show More
Show Less

Frequently Asked Questions

Applications and certificate records

Fees, status and delays

Ownership and financing

How can I apply for an occupancy certificate online in GHMC?

You can apply through the relevant occupancy certificate service on the TG-bPASS portal. Select the applicable application type and submit the building completion notice, sanctioned plan, drawings, photographs and other prescribed documents for verification.


Who issues an occupancy certificate in GHMC?

The competent municipal authority issues the occupancy certificate after examining the completion documents and verifying compliance with the applicable building requirements. The application is processed through the prescribed TG-bPASS workflow and the relevant GHMC officials.

Is an occupancy certificate mandatory in GHMC?

The requirement depends on the building category and applicable regulations. The published TG-bPASS timeline specifies that an OC is not required for certain residential buildings with a plot area up to 200 sq. m and a height up to 7 m. Check the current rules and application requirements for your building before assuming an exemption applies.

Can I apply for an occupancy certificate after completing construction?

Yes. You must submit the prescribed completion documents after construction is completed. The authority examines the drawings, photographs and other supporting documents before issuing the certificate, where required.

What is the occupancy certificate fee in GHMC?

GHMC's published Citizen's Charter specifies no fee at the time of filing an occupancy certificate application. However, separate compounding charges may apply if the authority identifies deviations that are eligible for compounding under the applicable rules.

How long does it take to get an occupancy certificate in GHMC?

The timeline depends on the building category. GHMC's Citizen's Charter specifies 15 days, while the TG-bPASS timeline provides instant processing for certain residential categories and 21 days for specified larger residential and non-residential buildings. Check the applicable service route for your property.

How can I check my occupancy certificate application status online?

You can check the application through the relevant TG-bPASS service using the reference details requested by the portal. If the application was submitted through another approved route, follow the instructions of that system or contact the concerned GHMC office.

What should I do if my occupancy certificate application is delayed?

Check the application status and confirm whether the authority has raised an objection, requested additional documents or scheduled an inspection. If the application remains pending beyond the applicable timeline, refer to GHMC's Citizen's Charter and contact the designated officer for delays or defaults.

Is an occupancy certificate the same as a building permit?

No. A building permit authorises construction according to the approved plan, whereas an occupancy certificate is issued after the completion stage to confirm the relevant compliance and occupancy approval.

Does an occupancy certificate prove ownership of a property?

No. It confirms the relevant building completion and occupancy approval. You should check the registered sale deed and other title documents to establish property ownership.

Can I sell a flat without an occupancy certificate in GHMC?

The documentation and legal requirements for a property sale depend on the building and applicable regulations. If an OC is required but has not been issued, its absence may raise compliance and due-diligence concerns for a buyer. Check the building's approval status before proceeding.

Is an occupancy certificate required for a loan against property?

The requirement depends on the lender, property type and applicable regulations. A lender may request the occupancy certificate and sanctioned plan as part of its legal and technical verification.

Show more Show less

Check your pre-approved offer now

 

An OTP will be sent to this number for verification

Bajaj Finance app for all your financial needs and goals

Trusted by 50 million+ customers in India, Bajaj Finance App is a one-stop solution for all your financial needs and goals.

You can use the Bajaj Finance App to:

  • Apply for loans online, such as Instant Personal Loan, Home Loan, Business Loan, Gold Loan, and more.
  • Invest in fixed deposits and mutual funds on the app.
  • Choose from multiple insurance for your health, motor and even pocket insurance, from various insurance providers.
  • Pay and manage your bills and recharges using the BBPS platform. Use Bajaj Pay and Bajaj Wallet for quick and simple money transfers and transactions.
  • Apply for Insta EMI Card and get a pre-qualified limit on the app. Explore over 1 million products on the app that can be purchased from a partner store on Easy EMIs.
  • Shop from over 100+ brand partners that offer a diverse range of products and services.
  • Use specialised tools like EMI calculators, SIP Calculators
  • Check your credit score, download loan statements and even get quick customer support—all on the app.

Download the Bajaj Finance App today and experience the convenience of managing your finances on one app.

Disclaimer

1. Bajaj Finance Limited (“BFL”) is a Non-Banking Finance Company (NBFC) and Prepaid Payment Instrument Issuer offering financial services viz., loans, deposits, Bajaj Pay Wallet, Bajaj Pay UPI, bill payments and third-party wealth management products. The details mentioned in the respective product/ service document shall prevail in case of any inconsistency with respect to the information referring to BFL products and services on this page.

2. All other information, such as, the images, facts, statistics etc. (“information”) that are in addition to the details mentioned in the BFL’s product/ service document and which are being displayed on this page only depicts the summary of the information sourced from the public domain. The said information is neither owned by BFL nor it is to the exclusive knowledge of BFL. There may be inadvertent inaccuracies or typographical errors or delays in updating the said information. Hence, users are advised to independently exercise diligence by verifying complete information, including by consulting experts, if any. Users shall be the sole owner of the decision taken, if any, about suitability of the same.