How to Check HMDA Approval Status Online

How to Check HMDA Approval Status Online

You can check Hyderabad Metropolitan Development Authority (HMDA) approval details through the authorised Telangana government approval services. Learn where to search, which documents to verify and what different approval statuses mean.

calculator
FAQs
Videos

You may have a pre-approved offer

Enter required home loan amount

Enter amount between ₹1 Lakh and ₹15 Cr

How to Check HMDA Approval Status Online
 

How to Check HMDA Approval Status Online

In summary

 

HMDA approvals help establish whether a proposed layout or building has received the relevant planning permission. In 2026, buyers must distinguish current BuildNow approvals from older HMDA DPMS and layout regularisation records.


  • Current approvals: BuildNow provides Telangana's unified building and layout approval services.
  • Older HMDA records: The HMDA DPMS public search supports searches of relevant legacy applications and permits.
  • Building permission verification: An approved permission can be retrieved using the building application number where supported.
  • LRS/BRS applications: Relevant approved or rejected proceedings can be searched through the applicable HMDA portal.
  • Property verification: Match the permit, approved plan, survey number and actual plot or building.
  • Home loan planning: An approval document supports property verification but does not guarantee financing or establish clear ownership.

Check the final approved documents before paying a substantial property advance. If you are purchasing an eligible residential property, check your Bajaj Finance Home Loan eligibility after completing the necessary property checks.

What is HMDA approval?

HMDA approval refers to development permission granted by the competent planning authority for an applicable layout or building proposal within its jurisdiction.


HMDA stands for Hyderabad Metropolitan Development Authority.


Its planning functions include regulating development according to applicable master plans, zoning provisions and development rules.


An approval helps establish that the submitted proposal has satisfied the relevant planning requirements at the time of sanction.


For example, a developer may obtain permission for a residential plot layout.


The approved layout plan should show the authorised plot arrangement, roads and other prescribed areas.


However, an HMDA approval does not independently establish ownership of every individual plot.


The buyer must also examine the registered title documents, survey details and other applicable property records.

Show more
Show less

Where can you check HMDA approval status in 2026?

The correct portal depends on whether the application is current, historical or related to layout regularisation.


Approval or applicationRelevant official service
Current building or layout applicationBuildNow Telangana
Older HMDA DPMS approvalHMDA DPMS Public Search
Relevant LRS/BRS proceedingHMDA LRS/BRS Portal
BuildNow technical or application assistanceBuildNow Support

The current BuildNow system integrates relevant approval workflows across authorities, including HMDA and GHMC.


However, older permissions may remain recorded in their original departmental systems.


For example, if a developer obtained approval in 2018, searching only the latest BuildNow interface may not locate the document.


Similarly, an LRS application should not be treated as an ordinary new building-permission application.


Select the route that matches the document's type and date.

Show more
Show less

How can you check HMDA approval through BuildNow?

BuildNow provides the current application and approval system for eligible building and layout proposals.


The applicant can access the relevant application through the portal, while buyers should request the approved permit and plan from the developer or seller.


To verify an approval:


  1. Visit the BuildNow portal.
  2. Open the available verification or application service.
  3. Enter the building application number where supported.
  4. Retrieve the relevant permission document.
  5. Check the issuing authority and approval date.
  6. Compare the property details with the seller's documents.
  7. Review the approved plan and any applicable conditions.

BuildNow's official FAQs state that an approved building permission can be verified and downloaded by quoting the building application number.


For example, Priya, a 32-year-old salaried professional in Hyderabad, is considering an apartment in a new project.


She asks the developer for the building application number and approved plan.


Priya should check whether the approval corresponds to the same project, plot and sanctioned construction.


If the developer supplies only a screenshot without sufficient identifying information, she should request the official document.

Show more
Show less

How can you search older HMDA DPMS approvals?

HMDA's Development Permission Management System (DPMS) provides public search functionality for relevant historical approvals.


The public search includes fields such as file number, applicant name, project type, district, mandal, village, survey number, plot number and permit number.


To search:


  1. Open the HMDA DPMS Public Search.
  2. Enter the file, permit or other available identification details.
  3. Select the relevant administrative location.
  4. Submit the search.
  5. Review the matching application or approval record.
  6. Obtain the approved proceedings and drawings where available.

For example, Rahul wants to buy a plot within a layout approved several years earlier.


The seller provides an HMDA file number and a layout plan.


Rahul can search the historical record and compare the approved layout with the plot being offered.


If the portal produces an error or the record cannot be retrieved, he should contact the relevant HMDA office rather than conclude that the layout is unapproved.


The DPMS public interface is a legacy service, so its availability and search results should be checked at the time of use.

Show more
Show less

What is an HMDA LP number?

An LP number is a layout permission reference used to identify an approved layout.


It helps buyers connect the seller's claimed layout approval to the relevant planning record.


For example, a developer advertises a plot as belonging to an HMDA-approved layout and provides an LP number.


The buyer should verify that the number corresponds to the correct layout, location and sanctioned plan.


An LP number alone does not prove that every plot being marketed is included in the approved layout.


DetailWhat to verify
LP or permit referenceMatches the official approval record
Approval authorityHas jurisdiction over the proposal
Survey numberMatches the land offered
Layout boundariesInclude the specific plot
Approved plot numberMatches the sale documents
Roads and open spacesMatch the sanctioned layout
Approval conditionsHave been addressed where applicable

An approved layout may contain reserved roads, open spaces or other areas that cannot be sold as ordinary residential plots.


A buyer should compare the actual plot position with the sanctioned drawing.

Show more
Show less

How can you check HMDA LRS approval status?

Layout Regularisation Scheme (LRS) records are different from ordinary new layout approvals.


The scheme addresses qualifying previously unapproved layouts under specific government provisions.


HMDA provides a separate LRS/BRS portal with a facility to search approved or rejected proceedings using the application number.


Follow these steps:


  1. Open the HMDA LRS/BRS portal.
  2. Locate the approved or rejected proceedings search.
  3. Enter the relevant application number.
  4. Submit the search.
  5. Review the proceedings and available plan.
  6. Confirm the result applies to the exact plot.

Consider Sandeep, a 39-year-old buyer examining a resale plot near Hyderabad.


The seller produces an LRS application receipt.


Sandeep should not treat that receipt as evidence of final approval.


He must verify whether the application was approved, rejected or remains subject to other action.


The actual proceedings and applicable conditions determine the position.


Source: HMDA – LRS/BRS Services.

Show more
Show less

What do different HMDA approval statuses mean?

The meaning of a displayed status depends on the specific government system and application.


The following distinctions help buyers interpret common stages.


Status or recordPractical meaning
SubmittedApplication has been lodged
Under scrutinyAuthority is reviewing the proposal
Shortfall raisedAdditional information or corrections are required
ApprovedPermission has been granted, subject to its terms
RejectedApplication has not received approval
RevokedPreviously granted permission may no longer remain effective
Approved plan availableSanctioned drawing can be examined

A submitted application is not an approved project.


Similarly, an approval issued for one version of a building does not automatically cover later construction changes.


For example, Priya finds an approved building plan showing five floors, but the developer advertises seven.


She should request any subsequent revised permission rather than assume the additional floors are authorised.


The official sanctioned drawing and current approval conditions matter more than the seller's description.

Show more
Show less

How can you verify an HMDA-approved plot?

Verify the layout approval and compare it with the specific plot before finalising a purchase.


Consider Rahul purchasing a residential plot in an HMDA planning area.


He should examine:


  • Official layout approval and sanctioned drawing.
  • LP number and approval date.
  • Plot and survey numbers.
  • Approved plot boundaries and area.
  • Road access and reserved open spaces.
  • Registered ownership documents.
  • Applicable land-use and development restrictions.

For example, Rahul's sale agreement identifies Plot 42.


He should locate Plot 42 in the officially approved drawing and compare its dimensions and boundaries.


If the plot falls within an area reserved for a road or open space, the transaction requires clarification.


A developer's promotional brochure should not replace the government-sanctioned layout plan.


The buyer must also verify whether the seller has the legal authority to transfer the specific plot.

Is HMDA approval the same as RERA registration?

No. HMDA approval and Real Estate Regulatory Authority (RERA) registration serve different purposes.


HMDA approval relates to applicable planning and development permission.


RERA registration applies to qualifying real estate projects under the relevant statutory framework.


ParticularsHMDA approvalRERA registration
Main purposePlanning and development permissionRegulation of qualifying real estate projects
Key recordsApproved layout, building plan and permitRegistered project details and disclosures
AuthorityCompetent planning authorityTelangana RERA
Buyer checkVerify sanctioned developmentReview project registration and disclosures

For example, Priya considers an apartment in a qualifying registered project.


She should examine the approved building plan and the project's RERA disclosures.


One does not automatically replace the other.


A project may also require permissions and documents beyond these two records.


Use the Telangana RERA portal for applicable project registration information.

What happens if a property has no valid approval?

A missing or invalid development permission can create legal, construction and financing risks.


The consequences depend on the property, competent authority and applicable rules.


Potential concerns include unauthorised development, enforcement proceedings, restrictions on further construction or difficulties obtaining required building documents.


For example, a buyer discovers that an advertised residential layout has only a pending application.


The buyer should not assume the layout will eventually be approved.


The application may require modifications or may be rejected.


An approved layout also does not establish that a subsequent building automatically has permission.


The buyer must identify the specific approval required for the property being purchased.


Before paying a substantial advance, obtain the official approval records and resolve any inconsistency through the relevant authority.

Does HMDA approval guarantee home loan approval?

No. HMDA approval supports planning verification, but a lender must separately assess ownership, income and property suitability.


Consider Priya, who earns Rs. 1.30 lakh monthly and has a CIBIL Score of 775.


She is considering a completed residential apartment priced at Rs. 60 lakh.


Assume she plans a Rs. 15 lakh down payment and requires a Rs. 45 lakh home loan.


ParticularsIllustrative amount
Property priceRs. 60 lakh
Down paymentRs. 15 lakh
Proposed home loanRs. 45 lakh
Interest assumption7.50% p.a.
Tenure20 years
Approximate EMIRs. 36,252

The EMI is approximately 27.9% of Priya's monthly income.


However, she must also account for existing debts, property charges and household expenses.


Bajaj Finance assesses the applicant's repayment capacity and the property's legal and technical documents.


An HMDA permit does not replace the registered title documents or complete lender verification.


After confirming the property's approval status and estimated borrowing requirement, Priya can check her Bajaj Finance Home Loan eligibility

What should you do if the approval cannot be found?

First, confirm that you are searching the correct government platform. An older DPMS approval may not appear through the latest BuildNow application route.


Check the application number, permit reference, survey number and relevant administrative location. Ask the developer or seller for the official approved document and sanctioned plan.


If the records do not match, request clarification from the issuing authority.


BuildNow provides an official support service for portal and application issues.


However, a technical search problem does not prove that the development has no approval.


Likewise, a seller's assurance does not establish that approval exists.


Do not proceed solely on the basis of an unverified application receipt.


Source: BuildNow – Support.

What should you check before buying an HMDA-approved property?

Confirm whether the relevant approval was issued through BuildNow, HMDA DPMS or the applicable older regularisation system.


Retrieve the official permit and approved drawings.


Match the survey number, plot or building identification, approved area and development conditions.


Check whether any revised permission is needed for the construction being offered.


Examine the seller's registered title and applicable encumbrance records.


For qualifying projects, review Telangana RERA disclosures separately.


If financing is required, calculate the down payment and EMI only after confirming the property's legal and technical suitability.


Approval verification should establish what was actually sanctioned, not merely whether the seller possesses an approval number.

Frequently Asked Questions

HMDA approval searches

Property verification and financing

How can I check HMDA approval status online?

Use the official portal relevant to the application. Current eligible building and layout permissions are processed through BuildNow. Older HMDA approvals can be searched through the DPMS public search, while relevant LRS/BRS proceedings use their separate portal. Enter the application, permit or supported property details and review the matching record. Confirm the approved drawing corresponds to the exact property before relying on the result.

How do I verify an HMDA LP number?

Obtain the LP number and approved layout plan from the developer or seller. Search the relevant official HMDA approval record and compare the layout location, survey number and specific plot details. Check that the plot is included in the sanctioned drawing and does not fall within reserved roads or open spaces. An LP number alone is insufficient if it cannot be matched to the exact property.

Can I check older HMDA approvals through BuildNow?

Not every older approval will be available through the current BuildNow system. HMDA's DPMS public search remains a relevant route for historical records. The older search includes fields such as file number, permit number, district, village and survey number. If a record cannot be retrieved, check the original approval document with the issuing authority. Do not assume that a missing search result automatically means there was no approval.

Is an HMDA application receipt proof of approval?

No. A submitted application or payment receipt only shows that a particular process has been initiated or paid for. It does not establish that the competent authority has approved the proposal. Buyers should obtain the final approval order and sanctioned plan. For LRS applications, verify the approved or rejected proceedings. If an approval is subject to conditions, examine whether those conditions affect the proposed purchase.

Is HMDA approval enough to buy a plot safely?

No. HMDA approval supports planning verification but does not independently prove ownership or freedom from encumbrances. Buyers should check the sanctioned layout, survey details, registered title documents, relevant mortgage records and land-use conditions. The specific plot must match the approved plan. Any mismatch should be resolved before making a substantial payment. Legal due diligence remains important even when the layout approval is valid.

Can I get a home loan for an HMDA-approved property?

An eligible HMDA-approved property may be considered for home loan financing, subject to the lender's assessment. Approval alone does not guarantee sanction. The lender must also verify legal title, property suitability, income, credit history and repayment capacity. After examining the official property documents and planning your contribution, check your Bajaj Finance Home Loan eligibility to explore financing options.

Show more Show less

Check your pre-approved offer now

 

An OTP will be sent to this number for verification

  • 4.4 Avg. app ratings, 1 Cr+ downloads
  • 45,000 Cr Avg. app ratings, 1 Cr+ downloads
  • 800 Cr Avg. app ratings, 1 Cr+ downloads

Disclaimer

1. Bajaj Finance Limited (“BFL”) is a Non-Banking Finance Company (NBFC) and Prepaid Payment Instrument Issuer offering financial services viz., loans, deposits, Bajaj Pay Wallet, Bajaj Pay UPI, bill payments and third-party wealth management products. The details mentioned in the respective product/ service document shall prevail in case of any inconsistency with respect to the information referring to BFL products and services on this page.

2. All other information, such as, the images, facts, statistics etc. (“information”) that are in addition to the details mentioned in the BFL’s product/ service document and which are being displayed on this page only depicts the summary of the information sourced from the public domain. The said information is neither owned by BFL nor it is to the exclusive knowledge of BFL. There may be inadvertent inaccuracies or typographical errors or delays in updating the said information. Hence, users are advised to independently exercise diligence by verifying complete information, including by consulting experts, if any. Users shall be the sole owner of the decision taken, if any, about suitability of the same.